Any new entrance, dri­ve­way, field entrance, or road­way con­nect­ing to a Coun­ty road­way shall have a drainage struc­ture that is shown as part of either the plot lay­out or a sep­a­rate draw­ing show­ing the entrance, dri­ve­way, field entrance, or road­way giv­ing all the prop­er sizes and dimen­sions.  Any prop­er­ly sub­mit­ted and approved drainage struc­ture asso­ci­at­ed with a new entrance, dri­ve­way, or road­way shall be main­tained by the Coun­ty High­way Depart­ment.  Any unap­proved drainage struc­ture will not be main­tained by the said Depart­ment and will have to be replaced by an approved struc­ture at the cost of the prop­er­ty own­er.  Fail­ure to com­ply with these require­ments shall result in revo­ca­tion of any approved Build­ing Per­mit.  Oth­er­wise, any prop­er­ty own­er giv­en notice of their non­com­pli­ance with the con­nect­ing entrance, dri­ve­way, field entrance, or road­way require­ments shall be giv­en thir­ty (30) days to come into com­pli­ance with this pro­vi­sion and this Arti­cle, or they shall be penal­ized as set forth here­in.